Abstrakt

Environmental impact assessment: Acase study of hydropower project

Bimlesh Kumar, Achanta Ramakrishna Rao


Although hydropower is very environmentally and economically sound project, it has effects on a local or regional scale. Present work addresses these issues and presents a viable procedural layout on environmental impact assessment (EIA) for implementing such project to the upcoming environmental engineers. The rapid impact assessment matrix (Pastakia, 1998) was used to get numerical impacts (adverse or beneficial) of different parameters. This method analyses and presents in a structured, friendly and transparent environment the numerous parameters and alternatives of an EIA. It considers all 4 components: physical/chemical, biological/ecological, social/cultural, economic /operational. Based on the analysis, it is shown that such a project will be positive economically but negative otherwise considering the other three components.


Haftungsausschluss: Dieser Abstract wurde mit Hilfe von Künstlicher Intelligenz übersetzt und wurde noch nicht überprüft oder verifiziert

Indiziert in

  • CASS
  • Google Scholar
  • Öffnen Sie das J-Tor
  • Nationale Wissensinfrastruktur Chinas (CNKI)
  • CiteFactor
  • Kosmos IF
  • MIAR
  • Geheime Suchmaschinenlabore
  • Euro-Pub
  • Universität von Barcelona
  • ICMJE

Mehr sehen

Zeitschrift ISSN

Flyer